Wednesday, July 22, 2009
Pex Tubing is Complete!
Today was significant because the Pex tubing is all hooked up! This picture shows Gary and George proudly standing in front of the Pex tubing valve manifold. The manifold is located inside the garage. The red tubes indicate hot water lines, and the blue tubes represent the cold water lines. Each of these lines had to be threaded up into the attic (that's where having George's climbing ability/flexibility is appreciated) and down to the each toilet, sink, shower, and tub connection. The next step is the installation of the valves--commonly known as the "rough plumbing". Our goal is to be in the house by Christmas!
Subscribe to:
Post Comments (Atom)






No comments:
Post a Comment