This is a picture of our building site with the ditches for the footings all complete. We hired a local backhoe operator to dig these for us. Gary says it was the best $600 he's spent in a long time! The footings had to be 12" deep and 24" wide. Rusty, the backhoe operator, also dug the ditches for the plumbing, propane, electrical, and phone lines. Some of the plumbing ditches had to be four feet deep! Can you imagine digging that by hand? This picture was taken facing west. (See the big pine tree in our future back yard?) 